Page 2 - Doepke_5961002_diz2025_3_en_digital
P. 2

page 2 ––– DIZ | Doepke-INfo-ZeItuNg                                                           No 3 | September 2025

        International guests at Doepke – welcome to Norden!






















        Our global partnerships are becoming an   (Hateha) and Hungary (Kamleithner) were   a company that uses our type B RCBOs
        increasingly important part of our daily   also guests in Norden. Learning about new   in its charging stations.
        work. As we intensify our international sales   products, planning joint market activities,   Last but not least, representatives from
          activities, establish new contacts and tap into   taking a look at our production facilities and
        new markets, the number of visitors from all   doing some sightseeing in East Frisia were   Walther-Werke France took the  opportunity
                                                                                  to kick off their visit with a traditional East
        over the world is also growing. A brief look at   among the highlights of the varied programme   Frisian tea party – a successful start to  a
        the first half of 2025 shows that we had a lot   for the trip.
        going on!                                                                   productive exchange.
                                             We were also visited by some of our more
        Several employees of our US partner Altech   recent partners, namely our Turkish distribu-  Each visit is a testament to a successful
                                                                                    working partnership and another step on
        took advantage of their visit to the Hannover   tor Novsen and Lidalco from Sweden. In fact,   our path to international growth.
        Messe trade fair to stop off in East Frisia.   Lidalco travelled together with PhaseBox,
        Not only has Altech been an importer of our
          products for many years, it also represents
        Doepke in many matters locally, acting as an
        extended arm of our company on the North
        American market. In addition to a tour of the
        factory, the main focus was on discussing joint
        projects – with plenty of enthusiasm and good
        ideas for the future.
        Employees from our long-standing distribu-
        tors in Switzerland (Demelectric), Belgium
        (DeMaegd), Austria (Stenna), the Netherlands







        “All it takes is a moment”

        Short-time delayed residual current circuit-breakers for safety and system availability
        Residual current circuit-breakers need to   As a result, the circuit-breaker trips.  Put in technical terms, because they feature
        trip immediately when a residual current   This can become a problem if it is not possible   a response delay, short-time delayed  residual
        occurs. But what does “immediately” mean?   to switch the power back on immediately –    current circuit-breakers only respond to
        The  maximum permissible time is defined                                     residual currents that last longer than a
        in the relevant standard (product standard   for example in the case of remote installations,   half-period of the power frequency.
                                             prolonged absences or sensitive loads.
        VDE 0664-10). Depending on the magnitude of                                Compliance with the tripping times required
        the residual current, the permissible switch-off   And in electrical installations with LED lights,
        times range between 40 and 300 milliseconds.  fluorescent lamps, strip lights, computer sys-  by the standard is therefore not a problem,
                                                                                   meaning that short-time delayed residual
                                             tems, solar power systems or a large number of
        However, there are cases where although   switched-mode power supplies, pulsed surge     current circuit-breakers can be used without
        “immediately” has to be within the switch-off   currents may occur when switching on, which   any issues in place of standard breakers.
        times required by the standard, it may be sen-
        sible to wait a short while. One such example is   can lead to (false) tripping of conventional   Our Type F RCCB and the AC-DC sen-
                                             residual current circuit-breakers.
                                                                                   sitive Type B are short-time delayed and
        during storms: lightning strikes that are some                               lightning-resistant as standard. As for Type A,
        distance away may result in short-term surges   These problems can be avoided using short-
        and voltage peaks in the installation. These give   time delayed residual current  circuit-breakers.   which is sensitive to pulsating and alternating
                                                                                   currents, the short-time delayed “KV” version
        rise to transient (temporary) leakage currents,   As the name suggests, they wait briefly when   can be selected.
        which a residual current circuit-breaker cannot   a residual current occurs. If it is still  present
        differentiate from an actual residual current.   after 10 milliseconds, then the RCCB trips.
   1   2   3   4